Role of Environmental Engineer
- Identifying the requirements for environment clearance & guidance on application strategies for all the stages of operations of the existing or proposed development activity.
- Monitoring of environmental related aspects in operations/processes so as to ensure the environmental compliances.
- Preparing effective monitoring, sampling & analysis plan for environmental aspects like water, wastewater, effluent, solid & hazardous waste, soil, flue gas emissions, vent gas as per CPCB/MOEF guidelines.
- Assist & contribute in establishment of Environmental Management System (EMS) and ensuring implementation of ISO 14001:2005 & other environmental standards on the project site.
- Ensure timely submission of statutory reports like environment statement, half yearly compliance reports, annual return submission to government/regulatory authorities etc.
- Prepare & review of monitoring reports, EC documents which includes EIA & risk assessment reports.
- Increasing awareness among personnel regarding statutory regulations & legal requirements in relation to impacts of environmental aspects.
- Conduct audits of EMS to check its effectiveness so as to ensure complete Enviro-legal compliance.
- Planning & coordinating sustainability data audits & data analysis.
- Developing SAP based module related to environment and its implementation.
- Follow up with regulatory agencies through local liasion & providing technical support.
- Conducting training programmes & promotional activities about the best EM practices to be followed during construction & operations stage.
- Preparing HSE reports & investigation of Environmental incidents.
- Plan the schedule for quarterly environmental review audits/ monitoring/ periodic statutory compliance filling.
- Planning the baseline monitoring & arranging for releasing the work orders for respective projects.
- Conducting the vendor qualifications by checking the work quality & reviewing the compliance reports/replies.
- Filing & submitting the applications to SEIAA, PCB, CGWA.
- Organising mock up or final presentation about the assessment of Environmental impacts of proposed or existing development activity.
- Assistance for the sitting of industry from environmental point of view or aspects.
- Carrying out EIA study & obtaining EC from MOEF/SEIAA.
- Obtaining statutory permits & consents like CTE/CTO/NOC.
- Registration for recycling/reprocessors of Hazardous waste from SPCB.
- Design, Engineering & process know-how of ETP, STP, ETP, Air pollution control equipments (APCE).
- Identifying the non-conformances (NC) in the testing activities. Ensure the traceability of all reference material.
- Conducting waste audit.
.
No comments:
Post a Comment